GJN
Urgent structural repairs where required to the Air Traffic Control Tower to extend the buildings life. Heavily corroded steel was either fully cleaned back to shiny metal or replaced. Repairs where then carried out using Flexcrete Monomix.
Bespoke Civils
Building Maintenance
Structural Repairs
Specialist Coatings
Street Furniture Install