GJN completed major stabilisation and refurbishment works to the old boating jetty at Fairhaven Lake. The old steel piling around the perimeter had deteriorated and the substructure had started to wash away. New sheet steel was fixed around the sides and over 2000 litres of grout pumped in to stabilise the slab. We then added power sockets and marine lighting to extend the opening hours of the jetty. All finished off with a timber deck ready for the new season
Bespoke Civils
Building Maintenance
Structural Repairs
Specialist Coatings
Street Furniture Install