GJN successfully completed the installation of over 300 metres of high-quality Broxap perimeter fencing and safety handrails at Fairhaven Lake, Lytham.
This large-scale public realm project required precision setting out, excavation and the formation of 450mm deep reinforced concrete foundations to ensure long-term
structural stability and durability in a coastal environment. All fence posts were securely fixed to withstand high winds and heavy public use, providing a safe and robust barrier around the
lake.