Following on from our successful contract with the Casey Group at Southport, GJN attended Memorial Park in Fleetwood. The park was having a major overhaul with new path, gardens and lighting. GJN core drilled 112mm diameter holes through stone planters into the foundation, then drilled horizontally through the foundation to form a conduit for cabling. The access was limited and work had to be conducted in a safe and controlled manner as the park remained open to the public.