Working closely with Fylde Council, we structurally repaired the footbridge on Lorne Street. The footbridge was in constant use by the local community and repairs were deemed vital to enable the bridge to remain open. GJN had one week to fully repair the bridge and apply a protective coating to help maintain a longer life for the repairs and existing concrete.